08.08.25

Choose carefully Charlie…

Posted in AST SpaceMobile, Echostar, Financials, Globalstar, Operators, SpaceX at 3:38 pm by timfarrar

Although to date EchoStar has only signed a $1.3B contract with MDA for the first 100+ satellites, with the second half of the constellation (and $5B investment) likely to remain as an option for the next couple of years, EchoStar will have to secure its initial launch contracts soon (potentially before more details of the system are revealed in September in Paris), and launches could cost as much as $700M-$800M just for the first 100 satellites.

One key question is whether EchoStar is now willing to put its faith in SpaceX as the launch provider, when SpaceX is fighting hard against EchoStar’s plans and is seeking access to the 2GHz spectrum, which is sorely needed to provide added capacity for the Starlink D2D constellation. Even if Chairman Carr now decides to drop the idea of a 2GHz/AWS-4 NPRM (assuming President Trump prefers to back Ergen instead of Musk) and reject SpaceX’s attempts to access the band in the US, I’d expect the fight to continue on a country-by-country basis around the world.

We’ve already seen a report in the WSJ last fall about how SpaceX appears to have used the leverage of launch contracts to gain coordination advantages for Starlink vs OneWeb and Kepler. And now it looks like a recent delay in Globalstar’s first set of 8 replacement satellites, from what a year ago was supposed to be a launch in the first half of 2025 to now the fourth quarter of this year, has provided more benefits to Starlink as part of the renegotiation of the launch contract (which was also extended to include a second launch of the remaining 9 satellites).

Certainly there are plenty of recriminations flying around about the cause of this delay in completing the satellites: Apple blames MDA, which in turn blames RocketLab, the subcontractor responsible for building the buses. It’s well known that MDA wasn’t happy with RocketLab’s performance on the contract, because MDA decided to bring the bus in-house for the new C-3 constellation. And this quarter Globalstar has now felt moved to add to the “important factors that may cause our actual results to differ materially from those anticipated” within its 10-Q, the risk of the “delay of the completion or launch of new satellites”.

But why would Apple be particularly upset, when these satellites offer no additional functionality and simply provide more resiliency to the existing Globalstar constellation, which (despite one satellite failing in 2025Q1) has lasted better than might have been expected back in February 2022 when the original MDA contract was signed?

It appears that the explanation lies in the fact that in May Apple ended up agreeing to support Starlink’s D2D service on the iPhone 13, a phone that isn’t compatible with Apple’s own Globalstar-based service and was left out of the original iOS update in January 2025. The timing of that decision appears to indicate that this was connected to SpaceX agreeing a last minute postponement of the Globalstar launch slot from Q2 to later in the year. Support for the iPhone 13 now gives Starlink a further advantage over Apple in the D2D race, at a point when Apple was already having an active debate within the company about whether it can (or should even attempt to) match Starlink’s pace of development.

Apple’s reluctance to create an even bigger source of tension with SpaceX also appears to have led Apple to sit out the current fight between EchoStar and Starlink over the 2GHz spectrum, and I believe there’s now no realistic chance that Apple will either invest in or become an anchor tenant for EchoStar’s planned D2D constellation at this point in time, contrary to earlier rumors.

In view of all this what will EchoStar decide about the launch contract(s)? Well one obvious possibility would be going to Blue Origin for New Glenn launches, since the timing of the EchoStar constellation with launches in 2028 is much better aligned with availability of the New Glenn rocket, compared to the contract that AST signed with Blue Origin back in November 2024. At the time, that was seen as an opportune satellite design for New Glenn to launch, as AST’s BlueBirds were supposed to be relatively light but very bulky, making them well suited for the huge New Glenn fairing (with an expectation that up to 8 could fit on a single rocket).

Of course that’s no longer the case, since AST’s first attempt at building a larger satellite has turned into a nearly 6 ton monstrosity. But conveniently for both sides, AST is hugely late in manufacturing its satellites, so there’s now no problem waiting to launch AST satellites (assuming AST can overcome its ongoing “developmental issues”) until New Glenn has space in its manifest in the second half of 2026.

It’s ironic that this mutually beneficial agreement to extend the dates in the AST-New Glenn launch contract has been taken out of context by AST investors and analysts covering the company, claiming that instead there was an agreement for Jeff Bezos to invest in AST. Because in reality, if Bezos wants to secure most of the EchoStar launch contract for Blue Origin, which is likely to be more competitive because there could be other launch options available in 2028, and he wants to continue his personal beef with Elon Musk, he’d be better advised to invest a modest amount in EchoStar’s D2D system instead.

08.06.25

Don’t mention the satellite delays…

Posted in AST SpaceMobile, Echostar, Operators, Regulatory, Spectrum at 3:51 pm by timfarrar

AST is clearly frantic to talk about anything other than the “developmental delays” which are holding up shipment of the FM1 satellite to India and have caused the launch to be pushed back to late fall, despite some employees apparently taking the trouble to go public about the company’s satellite manufacturing tribulations.

So that helps to explain the bizarre announcement today that AST has an “Agreement to Acquire Global S-Band Spectrum Priority Rights Held under the International Telecommunication Union”. AST clearly didn’t want anyone to look to closely at this spectrum deal, because they simply refer to acquiring an unnamed “entity”, and the press release is disingenuously worded to convince the company’s clueless cult of investors that AST will have priority over “up to an additional 60 MHz of mid-band satellite spectrum”.

It doesn’t take much effort to identify the entity concerned, which is Sky and Space Global (SSG), as multiple people have confirmed to me today. SSG made a failed attempt to enter the MSS market almost a decade ago, after going public in Australia, hyping up its “unique expertise in space technology” that was “set to revolutionize the existing satellite communications industry with its price disruptive first mover technology” and “bring affordable coverage to billions of the world’s most unserved people”. AST’s original business plan (which involved a large number of nano-satellites and was intended to start with an equatorial constellation) could almost have been taken straight from the SSG pitch.

SSG only launched 3 satellites back in 2017, which de-orbited in spring 2023, though the filing was brought back into use by one of the satellites launched on the Jan 14 Falcon 9 Transporter-12 rideshare. But what AST’s language is trying to obscure is that SSG’s ITU filings have lower priority than both EchoStar and Omnispace, and also describe a system which is completely incompatible with AST’s recent application to the FCC.

AST is now planning 248 satellites of which 220 will be at 53 degrees inclination and the remaining 28 in sun synchronous orbit, having abandoned its original plan for an equatorial constellation. However, SSG (whose filing is named SSG-CSL in the ITU database) has filed for only 3 test satellites in sun synchronous orbit and the remaining 360 satellites in near equatorial orbits (0, 10 and 13 degrees inclination). So even if AST adjusted its orbit plan to conform with SSG’s filings, it would then be useless for serving high value markets in Central and North America, Europe, the Middle East and Asia.

That’s why it isn’t surprising that SSG’s licenses are so cheap, compared with EchoStar and Omnispace, and why by choosing to acquire SSG rather than say Omnispace, it is clear that AST is more interesting in gaining favorable PR (from people who either don’t understand or would prefer to lie about how spectrum rights work) than actually providing service using this filing. Just don’t ask when (if ever) AST will actually launch a constellation.

08.02.25

Everything you wanted to know about D2D but were afraid to ask…

Posted in AST SpaceMobile, Echostar, Handheld, Lynk, Operators, Regulatory, Services, SES, SpaceX, Spectrum, ViaSat at 9:36 am by timfarrar

Yesterday EchoStar chose to announce its plans for a new $5B D2D constellation of 200 satellites, including an initial US$1.3B contract with MDA to build the first 100 satellites. Though the MDA contract was in line with my prediction back in March, EchoStar’s heavy emphasis on prospective wholesale partnerships with mobile operators during the results call suggests that Apple has declined to provide financial backing for the system. That’s perhaps unsurprising after the press revelations in May describing a lack of consensus within Apple about whether to continue investing in D2D.

As EchoStar CEO Akhavan noted in the results call, EchoStar had to make a decision now, because the EU is in the process of deciding what to do about the current European 2GHz licenses held by EchoStar and Viasat when they expire in spring 2027. Indeed I understand that EchoStar assured the EU of its plans to build this system in its confidential response to the EU’s consultation back on June 30. Now we face an all-out battle between at least four players (Viasat, EchoStar, AST/Vodafone and SES/Lynk) for only two licenses when they are awarded at the end of this year.

However, EchoStar’s announcement also came as an unwelcome surprise to many investors, who were hoping that reports earlier in the week of FCC Chairman Carr’s “Best and Final Offer” to sell AWS-4 spectrum signaled that EchoStar would scale back its ambitions and strike a deal to sell or lease this spectrum. Contrary to some analyst perceptions, the biggest threat from the FCC has always been a potential rulemaking on the 2GHz MSS band that would open it up to additional sharing by Starlink. However, it was also very unlikely that Elon Musk and Charlie Ergen would have a meeting of minds on the value of this spectrum in any commercial deal for Starlink to access the band.

So its now clear that Ergen has decided to defy Carr’s mandate and move forward on his own, without providing any evidence that a major new partner for the system has been secured. Hopefully clarity on financing and partnerships will be provided in September when EchoStar has promised to give more details of its plans. But in the meantime, Carr must decide whether to launch a 2GHz rulemaking or leave Starlink out in the cold without access to MSS spectrum that will soon be sorely needed to increase the capacity of its D2D system. Carr’s decision may well turn on whether Ergen has secured President Trump’s backing, after his recent falling out with Elon Musk, and that would certainly help to explain why EchoStar is highlighting a large headline investment of $5B in the planned D2D system.

Fortuitously for those who are trying to make sense of these developments, yesterday evening I also released my new 100+ page deep dive report on D2D, telling you everything you need to know about D2D technology, regulation and the progress of all the different satellite operators involved in this market, updated with the latest information on EchoStar, AST, Starlink, Apple/Globalstar and other planned systems. We’ve seen lots of ludicrous forecasts about the size of this market, which simply fail to understand the technological constraints on these services in terms of capacity, data rates and costs. Unlike these other forecasts, my analysis looks at realistic capacity, usage and pricing models to assess how many customers Starlink and AST’s systems can serve and what they will need to charge per Gbyte of capacity. That’s a familiar topic to who followed my blog posts on LightSquared back in 2011-12 when it became clear that there was no there there…

I also analyze regulatory constraints, feasible deployment schedules (especially in light of continuing delays for AST which make the company’s claimed launch plans totally implausible) and how much spectrum will be needed for these systems to operate. As I discussed in another report back in January, MSS spectrum (and the 2GHz band in particular) is likely to be critical to providing adequate capacity for D2D constellations. Starlink only has a paired 5MHz block of spectrum in the US, but has already decided that it needed to upgrade to a paired 15MHz block in New Zealand after only 6 months of operations. So EchoStar’s announcement, and how the FCC now decides to respond, will be critical in determining the future direction of this market.

07.25.25

How to annoy the FCC…

Posted in AST SpaceMobile, AT&T, Operators, Regulatory, T-Mobile at 8:58 am by timfarrar

It’s been obvious for a long time that the quality of AST’s regulatory submissions has been poor, which has led to considerable delays in gaining FCC approval, as was evident when it took more than four years from the time AST’s initial petition for market access was submitted in April 2020 before approval was granted in August 2024 for launch of five BlueBird-1 satellites. I heard complaints on more than one occasion that more professionalism was needed from AST, with contrasts drawn to the high quality and intense focus of SpaceX’s regulatory team working on SCS. And the company seemed to have acknowledged this concern by hiring Jennifer Manner in May 2025.

But over the last month, AST and its partner AT&T have taken it upon themselves to go to a whole new level in causing annoyance to FCC staff. On July 1, AST “urge[d] the Commission to approve the [FM1] Application by July 11 to allow safe shipment of FM1 for its scheduled August launch on time. Failure to do so will place our ability to launch in August at significant risk.” The irritation of FCC staff was clear in a July 2 email noting that “due to substantial changes in the technical parameters of your S-band request, we will need to coordinate new spot frequencies with NTIA. This will restart the coordination timeline with NTIA”. Nevertheless, the NTIA and FCC pushed this through and granted the FM1 approval on July 11 as requested. But then AST didn’t ship the FM1 satellite the next day, and has now revealed that in fact the satellite won’t be shipped to India until August. So why did the FCC and NTIA have to put in all that work over the July 4 holiday?

AT&T’s actions this week have been even more egregious, with an announcement on July 23 (timed to try and counter T-Mobile’s launch of Starlink D2D satellite service that day) stating that “On Monday, July 21, AT&T and AST SpaceMobile successfully completed the first-ever native voice call (VoLTE) and text (SMS) made directly through AST’s Block 1 satellites with a standard cell phone using AT&T spectrum and passing through the AT&T core network.” But AST’s license for testing with AT&T expired on May 30 and the request for renewal has not yet been granted. So if AT&T did conduct a “call and text [which] utilized AT&T’s spectrum and commercial network” on July 21, that was clearly outside the licensed testing period.

As an aside, it’s also worth noting that AT&T has now pulled back on prior claims that AST will support broadband data services including video calls, modifying the website from the original version to indicate only that “One day [the satellite service] may also support video services”. AT&T also shifted from claiming that “Our customers will have access to a satellite-based cellular network with a standard smartphone – no special device is needed” to indicating that “More information on eligible devices and service requirements will be shared closer to launch”.

One potential reason for the delay in the FCC renewing AST’s applications for continued testing is that AST has also simply ignored the conditions of its test licenses, which required the company to “submit a test report in the ELS license file for this grant within 150 days reporting on activities occurring during the first 90 days of the license”. So for the AT&T testing license granted on January 23 (the grant letter erroneously says 2024 but it was actually granted on January 23, 2025), the initial test report would have been due by no later than June 22. However, to date, no test reports have been filed for any of AST’s BlueBird-1 experimental license grants.

The FCC has been accommodating of AST’s regulatory failings to date, and put the company’s June 2025 modification submission on public notice with regard to the feeder links and TT&C. That might even allow for approval of satellite launches later this year if the recent submission of an SCS agreement with FirstNet is deemed compliant. But before getting to that point, the FCC will also need to decide whether to overlook AST and AT&T’s recent violations of AST’s experimental license conditions.

EDIT (7/25): Well it seems like I ruined somebody’s Friday evening dinner plans, because a few hours after this post was published, AST submitted the delinquent 90 day test report for its experimental testing with AT&T and Verizon. Presumably the other missing test reports for the UK and Turkey will be filed soon as well.

EDIT (7/26): If the FCC was mildly annoyed with AST’s incompetence before, they must now be completely furious after AST submitted a new letter on Friday evening, characterized as a response to the Space Bureau’s request for additional information. And I can only conclude that the company’s engineers are total idiots. This letter completely contradicts itself, with the answer to question 1 stating that FM1-FM23 “will be deorbited from 520km through atmospheric drag” while AST’s “additional clarification” at the end indicates that after FM1 and FM2 (which is now clearly intended to be launched on a dedicated Falcon 9 rocket at huge cost), of the “up to 20 satellites” that AST “anticipates launching…through the end of this year…the remaining 18 satellites will operate at an altitude of 690km”.

And if this “additional clarification” is taken at face value, then the current public notice and comment period has just been invalidated, since the comments received on July 21 were based on AST’s June 12 submission, which claimed that FM1-FM23 would orbit at 520km and that these satellites would only carry 20kg of fuel. I’m left wondering if the paragraph on “planned upcoming satellite launches” was simply inserted by company management at the last minute to try and pump up the share price, and no one checked for compatibility with the rest of the document or AST’s prior submissions.

Of course if FM3-FM23 were at 690km then that’s not compatible with AST’s claim today (in response to question 5) that “The nominal deorbit plan is powered deorbit to below 530km”. And incidentally it also makes no sense for AST to suggest in response to question 4 that “During the disposal phase, the spacecraft will randomly tumble due to its shape and mass distribution throughout its descent, except for collision avoidance maneuvers during which the spacecraft will operate with an edge-on orientation” when AST indicates in question 1 that only “approximately 1kg of Xenon will remain available on FM1-FM23 for collision avoidance maneuvers throughout the mission-life and post-mission phases” since that’s certainly not going to be sufficient to stabilize such a huge spacecraft within a few hours and perform collision avoidance. Is AST instead suggesting that after FM2 it will move straight to launching FM24 and defer FM3-FM23 until later? Or is AST intending to use direct injection to 690km? It’s impossible to tell…

This continues AST’s prior incompetence in engineering submissions that was so evident during the review of FM1, when the company claimed that the mass in the Orbital Debris Assessment Report didn’t add up because of “quantity errors in the input” and “omissions” of various components. Then AST just added in suspiciously round numbers of 5000 fasteners (each weighing exactly 10g) and 100 brackets (each weighing exactly 500g) and still couldn’t make the mass of the phased array on FM1 and FM2 add up to 2863kg (an error of 117kg which has been carried over to the June 12 modification application).

It’s now hard to see how anyone can prepare reply comments based on this new nonsensical AST submission. So unless and until these issues are clarified, I suspect the FCC will either have to extend the reply timeline or even restart the whole process from scratch.

« Previous Page « Previous Page Next entries »