11.01.13

Style points….

Posted in DISH, Globalstar, Iridium, Operators, Regulatory, Spectrum at 7:52 pm by timfarrar

So, as many expected, Globalstar’s NPRM finally emerged from the FCC tonight, before the new Chairman, Tom Wheeler, is sworn in on Monday. It appears that Wheeler has had a strong influence on the rather subdued language in this NPRM, which takes a much more equivocal stance than similar NPRMs (and has even been toned down compared to previous drafts, or so I’m led to believe).

As the language perhaps reflects Wheeler’s more cautious stance compared to former Chairman Genachowski’s “full speed ahead” approach, it is hard to predict what this will mean for Globalstar’s potential approval process. However, it is clear that it will take some time, because the FCC is seeking detailed technical studies from commenting parties, and has set a relatively long comment deadline of 75 days after publication in the Federal Register (i.e. January or February 2014).

Nevertheless, it is instructive to compare the language to DISH’s AWS-4 NPRM in March 2012, especially as that is the model that Globalstar sought in its petition, which stated that “the Commission’s rulemaking proposal on terrestrial use of Big LEO spectrum should incorporate a number of the basic reforms proposed by the Commission in the 2 GHz NPRM”. As a starting point, the DISH NPRM set a comment period of 30 days after publication, but more notable is how definitive the DISH NPRM was about its intentions:

DISH: “In this Notice of Proposed Rulemaking, we propose to increase the Nation’s supply of spectrum for mobile broadband by removing unnecessary barriers to flexible use of spectrum currently assigned to the Mobile Satellite Service (MSS) in the 2 GHz band”
Globalstar: “By this Notice of Proposed Rulemaking (Notice), the Commission proposes modified rules for the operation of the Ancillary Terrestrial Component (ATC) of the single Mobile-Satellite Service (MSS) system operating in the Big LEO S band”

DISH: “With this proceeding we intend to fulfill the Commission’s previously stated plan to create a solid and lasting foundation for the provision of terrestrial services in 40 megahertz of spectrum in the 2 GHz band”
Globalstar: “For all the reasons stated herein, we believe that Globalstar’s proposal to deploy broadband access equipment should be further examined and a record developed to determine whether this proposal has the potential to enable more efficient use of Globalstar’s S-band spectrum and spectrum in the adjacent band. This action could potentially increase the amount of spectrum available for broadband access in the United States”

DISH: “According to Cisco Systems, North American mobile Internet traffic more than doubled in 2011 and is expected to grow over 15-fold in the next five years. This explosive growth is creating an urgent need for more network capacity and, in turn, for suitable spectrum”
Globalstar: “The rapid adoption of smartphones and tablet computers, combined with deployment of high-speed 3G and 4G technologies, is driving more intensive use of mobile networks. According to Cisco Systems, global mobile Internet traffic is expected to grow over 13-fold from 2012 to 2017″

DISH: “In this Notice of Proposed Rulemaking (AWS-4 Notice), we build on the Commission’s recent actions to enable the provision of terrestrial mobile broadband service in up to 40 megahertz of spectrum in the 2000-2020 MHz and 2180-2200 MHz spectrum bands. We propose terrestrial service rules for these spectrum bands that would generally follow the Commission’s Part 27 rules, modified as necessary to account for issues unique to the 2000-2020 MHz and 2180-2200 MHz spectrum bands. Given the proximity of these spectrum bands to spectrum bands previously identified as AWS, in our proposal we refer to these spectrum bands as “AWS-4″ or “AWS-4 spectrum”
Globalstar: “We believe that Globalstar’s proposal to deploy a low-power terrestrial system in the 2473-2495 MHz band should be examined to determine whether it is possible to increase the use of this spectrum terrestrially in the near term, without causing harmful interference to users of this band and adjacent bands, and without compromising Globalstar’s ability to provide substantial service to the public under its existing MSS authorization. If supported by the record, this action could potentially increase the usefulness for terrestrial mobile broadband purposes of 11.5 megahertz of licensed spectrum. As a result, these changes may induce increased investment and innovation throughout the industry and ultimately improve competition and consumer choice. Therefore, we propose to make the changes to Part 25 of the rules necessary to provide for the operation of low-power ATC in the licensed MSS spectrum in the 2483.5-2495 MHz band”

(note that Globalstar also sought to operate under Part 27, which the Commission rejected, and I’m told that an earlier draft of the NPRM also contained a proposed new name for this band, although not the “AWS-5″ designation that Globalstar had sought)

As far as the specifics of the NPRM proposal goes, it appears that the FCC has gone along with Globalstar’s requested TLPS power and OOBE levels, while highlighting that “significant concerns have been raised about potential detrimental impact on unlicensed devices, such as Bluetooth, that are currently used extensively for various wireless broadband services and applications”. However, there are a number of lurking issues, such as the process to be used for approving any changes to devices to use the new service (which will fall under Part 25 so would normally require a new FCC ID to be granted for an existing Part 15 device operating in the WiFi band).

In addition, proposed use of Part 25 along with a simple modification to the existing ATC rules to require TLPS to be permitted (so long as Globalstar can “demonstrate the commercial availability of MSS, without regard to coverage requirements”), could make it harder to get LTE approval in the future, especially in the L-band, where the FCC warned Globalstar that “Should we find it to be appropriate, the Commission reserves the right to consolidate this proceeding with any proceeding addressing Globalstar’s L-band proposal and Iridium’s petition for rulemaking” (creating a risk that some L-band spectrum could be reallocated to Iridium if Globalstar pushes for LTE authorization: the FCC quietly issued a public notice seeking comment on Iridium’s petition for reallocation of L-band spectrum on Friday as well).

So now the question is whether Wheeler will be prepared to work through these issues, face down the interference concerns and push through a final order approving TLPS, or if he will instead prioritize the 3.5GHz band, where a public notice was also issued today (with a much shorter comment cycle), seeking further comment on how “Priority Access” licenses (which as I’ve remarked before could be somewhat similar to TLPS) might be allocated for exclusive use.

UPDATE (11/3): Globalstar’s press release noted that the release of the NPRM “represents a seminal development and yet another step forward in Globalstar’s renaissance”. However, unlike in September, when the NPRM was circulated, its notable that the company didn’t say that it was “very pleased” with the FCC’s action. Globalstar’s comment that “We look forward to receiving the public’s comments and working towards a final order over the next several months” is also a curious description of a process where reply comments won’t even be received for 3.5 months after publication of the NPRM in the Federal Register.

4 Comments »

  1. Globalstar (GSAT) Takes Another Step said,

    November 4, 2013 at 8:45 am

    [...] For more details, we cannot endorse all of the following author’s work, but we agree with this particular analysis: http://tmfassociates.com/blog/2013/11/01/style-points/ [...]

  2. LightSquared, the sequel? FCC weighs Globalstar’s plan to use satellite airwaves for Wi-Fi — Tech News and Analysis said,

    November 4, 2013 at 12:25 pm

    [...] order, according to satellite broadband analyst and Gigaom contributor Tim Farrar. From Farrar’s blog: As the language perhaps reflects Wheeler’s more cautious stance compared to former Chairman [...]

  3. ETCentric said,

    November 6, 2013 at 7:55 am

    [...] Globalstar’s potential approval process.,” writes GigaOM contributor Tim Farrar on his blog. < PREVIOUS [...]

  4. Tripling Your Money: Work Less, Make More!PoisedToTriple.com said,

    November 7, 2013 at 1:04 pm

    [...] more details on GSAT’s NPRM announcement, we agree with this analysis. As mentioned before, I don’t necessarily endorse all of the author’s work, but agree with this [...]

Leave a Comment

You must be logged in to post a comment.